In progress

Call David today on (03) 5278 2066 or request a call back with the service required:

In progress

 

Taswater 3x Water Treatment Plants (Laurie Curran Water)  – Mechanical installation of Membrane Filtration plant including but not limited to the following systems.

  1.  Feed water pumps.
  2.  In-line chemical mixing and coagulation
  3.  Membrane filtration
  4.  Water and air backwash pipework and control valves.
  5.  Clean in Place treatment of the membranes pipework and control valves.
  6.  Membrane integrity testing equipment.
  7.  Clear Water Storage.

Wallan STP Upgrade (Laurie Curran Water) – Mechanical installation of various equipment including but not limited to the following systems.

  1.  Lift pumps.
  2.  Chemical dosing systems.
  3.  Tertiary Filter system.
  4.  Backwash system pipework and control valves.
  5.  Recycle and Potable water service lines.
  6. Sample water system.
  7.  Wash Water System.